South Dakota, USA · Inspection & retrofit

Keystone Wye

Completed Keystone Wye timber bridgeInspection & retrofit

Wood Research and Development was commissioned by Stantec Engineering to complete an inspection on the Keystone Wye Interchange which consisted of two timber highway bridges. Analysis of the structure has determined that the bridges are in good shape with some restoration and maintenance required. WRD designed a fix involving diffusing all timber elements with SWT Readings in the yellow and red zones to arrest decay, epoxy filling gaps between girder and the road deck and continuing the process of cleaning and staining the surface of the timber.

It was recommended that a follow-up of non destructive testing should occur within two years of the original testing. Following the recommendations should prolong the useful life of the structure for another 50 years.

Project team

Inspection & restoration teamRodney Rosecrans, Matt Cole, Alvin Young
Design engineersClay Hoger, Simon Gong, Andrew La Spina, Madison Bower
CAD technologistsAndrew Noble, Lynn Foucault
Client
Stantec Engineering
Location
South Dakota, USA
Dates
Feb 26 – Apr 8, 2018
Total project cost
$80,505
Service
Inspection & retrofit