Four services. One standard of excellence
From a single decayed beam to a complete new glulam span, every TRS engagement runs through the same ISO 9001-certified process, and every structure is built and load-tested before it ships.
Timber structure restoration, repair & replacement
We assess, repair, reinforce, or fully replace heavy timber structures and bridges, extending service life by decades while keeping as much original material as the structure allows.
- Load-path analysis and board-by-board condition reporting
- In-kind heritage repair with species-matched timber
- Full replacement engineered to a 100+ year design life
Mass timber construction & new build development
Glulam bridges and mass timber buildings, engineered and fabricated to a century-plus design life. We take new builds from development through to a load-tested, ready-to-install structure.
- Glulam bridge design and construction
- New build development for arenas, facilities & spans
- Engineered for 100+ years with responsible sourcing
Proprietary reinforcement technology
FiRP® panels, Retroshear® and Retroten® reinforcement, and EPHOD® testing, our proprietary patented IP, raise design stiffness 50–100% and detect hidden decay before it becomes failure. Reinforce in place; keep the original structure.
- FiRP® panels: 50–100% stiffness gains (Retroshear® & Retroten® panels)
- Structurfill® epoxy & RetroWrap® fiber wrap for in-situ repair
- 40+ patents, our own technology, not licensed
Full shop assembly, before anything ships
Every structure is assembled and load-tested in our climate-controlled Jefferson, Oregon facility before treatment or shipping. You see it standing and proven before it ever reaches your site.
- Full assembly & load test in a controlled environment
- Treatment applied after proving, not before
- Off-site fabrication that compresses on-site time
Tell us about your structure
Whichever service you need, it starts the same way, a conversation with a builder who has done it before.