Learn with us
Assembling the best timber construction and restoration team in the world
Check out our blog
Stay up to date on our recent projects and discoveries
Mass Timber: Building a Better Future
As we head into a period where tight budgets and fiscal scrutiny will be at a high, municipalities will be looking for ways to build that are both cost-effective and sustainable. Studies show that mass Timber products are sustainable, durable, reduce project times,...
Flowerdale Lagoon: Pedestrian Foot Bridge
Wagga Wagga City Council launched the Wiradjuri Trail Master Plan in August 2021, setting out a 10-year improvement blueprint that includes more than $6 million worth of proposed development. The aim is to “connect the local community and environment, highlight...
Flashback: Retrofit of Utchee Creek Timber Bridge | VIDEO
https://youtu.be/aDa6uk19ILs In 2015, we were tasked by the Cassowary Coast Regional Council (CCRC) to replace the deck and superstructure on top of the existing substructure and restore the Utchee Creek Bridge #1 to a T44 load rating. In this project, there were 3...
Rehabilitating Concrete-Decked Timber Bridges (Doolan Deck Bridges)
Modular bridging systems became popular in the early 1990s having started with the appearance of the Doolan Deck bridge system for the repair of the Buccarumbi Bridge over the Nymboida River in northern NSW. Throughout Queensland and New South Wales, there was a...
Take a deeper dive
Review our e-books, case studies, and white papers for a more in-depth understanding of our unique methods and past work.